Home        Check E-mail       Post Your Resume      FMSCRM       Contact Us

FAIRMATE CHEMICALS PVT. LTD.
In Technical Collaboration with M/s. R.B.P. Ltd. U.K.
 
An ISO 9001
ISO 14001 &
OHSAS 18001 CO.
 
Home About Us Quality Products Application Technical Reference Web Sites
 
 

FAIRSEAL P
POURABLE GRADE TWO PART
POLYSULPHIDE SEALANT
Conforms to BS-4254:1967

 


DESCRIPTION

FAIRSEAL P is polysulphide base sealant of pourable consistency, which is suitable for sealing horizontal joints and gives excellent adhesion to most surfaces including concrete, wood, glass, aluminium and stainless steel. FAIRSEAL P comes in two part consisting of base abd hardner. FAIRSEAL P may be applied to joints between 5 mm to 50 mm wide.

 

APPARATUS

Electrically operated drill with paddle attachment
Container

Cello tape
Steel Spatula

Back material (Rod)
Wire Brush 

 

SURFACE PREPARATION

-› All joint surface should be thoroughly cleaned with brush and then with

    water & should be allowed to dry.
-› Stains of oil and grease should be removed by wire brushing and use

    FM-DEGREASER.
-› FM DEGREASER is solvent based cleaner and degreaser, which easily

   removes stains of oil and grease.
-› Apply a coat of FAIRSEAL PRIMER on both sides of joints, which gives

    very strong electronic bond between joint and sealer.  

 

MIXING AND APPLICATION

-› FAIRSEAL P is supplied in two parts containing base and hardener

    prepacked in correct proportion.
-› For mixing of base and hardener, first the base is taken in container

   and hardner is added slowly in base and is mixed with electrically

   operated drill machine with paddle attachment until uniform colour is

   obtained.
-› The mixing of base and hardener should be done thoroughly because

   many times failure of sealant occurs due to improper mixing of

   components.
-› Before application of FAIRSEAL P, FAIRSEAL PRIMER should be dry

   initially.
-› After proper mixing of FAIRSEAL, it should be poured in joints drawing a

   flat tool like stainless steel spatula.
-› For better finishing of SEALANT, it is recommended to draw stainless

   steel spatula coated with kerosene.
-› FAIRSEAL P sets within 18hrs at temperature 30-350C and if

    temperature is 250C, it sets in 24hrs.
-› FAIRSEAL P should be cured for 12 days at 30-350C temperature and for

    2 weeks if temperature is 250C.
-› The quantity of FAIRSEAL P required per running metre is calculated by

    following equation.
    Quantity = (1.6x bxd)/1000 kg. per running metre
    Where b = width of joing in mm
    D = depth of joint in mm

QUALITY ASSURANCE
Fairmate manufactures entire range of construction chemicals under compliance of ISO 9001-2000, ISO (EMS) 14001 & OHSAS 18001 (Occupational Health and Safety) certified by KPMG Peat Marwick.

TECHNICAL SERVICES
While new advances and changes will take place one thing will never change is quality and meeting special needs of customer. Our laboratory in Baroda and technical personnel & experts are available to provide additional information and technical assistance. We are eager to work with you in development of new product and solve your problem.

 

 
sales@fairmate.net
  © Copyright 2006. Design by FAIRMATE