Home        Check E-mail       Post Your Resume      FMSCRM       Contact Us

FAIRMATE CHEMICALS PVT. LTD.
In Technical Collaboration with M/s. R.B.P. Ltd. U.K.
 
An ISO 9001
ISO 14001 &
OHSAS 18001 CO.
 
Home About Us Quality Products Application Technical Reference Web Sites
 
 

FAIRTOP
HARD WEARING, ABRASION RESISTANT
MONOLITHIC INDUSTRIAL FLOORING COMPOUND

 


DESCRIPTION

FAIRTOP is ready to use single pack, hard wearing, abrasion resistant, smooth finish anti skid industrial flooring compound for medium to heavy duty traffic floors. It resists penetration of oil and water. FAIRTOP is ready to use material the application is also very simple.

 

APPARATUS

Flat trowel for levelling

 

SURFACE PREPARATION

As FAIRTOP is applied over fresh concrete, no surface preparation is required.

 

MIXING AND APPLICATION

-› FAIRTOP is ready to use material, so no mixing is required before using

   it.
-› After laying of base concrete, when a person puts thumb on the

   concrete, the concrete should not stick on thumb but the impression of

   thumb remains on concrete, at that time sprinkling of FAIRTOP powder

   should be done on base concrete.
-› The sprinkling rate of FAIRTOP is 5kg/m2, so accordingly one can

   estimate the total quantity of FAIRTOP. After calculating total quantity of

   FAIRTOP, divide the quantity in four parts.
(I)    Sprinkle FAIRTOP by hand on peripherial area of width 100-150mm.

        When surface darkens with absorption of water, it is levelled with flat

        trowel or power float using disc attachment. In areas where saw cut

        joints are tobe located, an extra quantity of floor hardner can be

        applied. Ensure that edges are fully Compacted.
(II)  Sprinkle second part of FAIRTOP immediately after levelling of first

       part. Second part should be sprinkled evenly on entire area including

       the peripherial area and when surface darkens, level it with flat

       Trowel.
(III) After 2hrs. of first levelling, again the surface is levelled to close any

       pores and remove any adulations on the surface.
-› The surface should be covered with a polythene sheet after final

    levelling and made air tight by placing sand around the sheet for a

    minimum period of 7 days.

QUALITY ASSURANCE
Fairmate manufactures entire range of construction chemicals under compliance of ISO 9001-2000, ISO (EMS) 14001 & OHSAS 18001 (Occupational Health and Safety) certified by KPMG Peat Marwick.

TECHNICAL SERVICES
While new advances and changes will take place one thing will never change is quality and meeting special needs of customer. Our laboratory in Baroda and technical personnel & experts are available to provide additional information and technical assistance. We are eager to work with you in development of new product and solve your problem.

 

 
>    FAIRTOP
>    FAIRTOP HD
sales@fairmate.net
  © Copyright 2006. Design by FAIRMATE